SBI PO Prelim Exam Question
If 3 men can finish their work for 8 days, then how many men are needed to finish their work in 6 days? a) 5 Men b) 4 Men c) 8 Men d) None of these
- 16031 Views
- 381 Answers
381 Answers
- can any one tell me the detailed syllabus of sbi po exam with proper exam pattern. please reply me as soon as possible am very thankful to you.
- syllabus
- manage time in SBI po
- SBI PO Prelim Exam Pattern
- What is SBI PO Mains? What is the required educational qualification?
- A bottle contains three-fourth of milk and the rest water. How much of the mixture must be taken away and replaced by an equal quantity of water, so that the mixture has half milk and half water?
- When will the registration start for SBI PO Prelim examination? Please tell me.
- I'm? not able to view the SBI po prelims result
the captcha image is not visible
- hey I m gd in english n maths but worried abt reasoning so hw score minimum to qualify??
- countries home
Practice Mock Test
sbi po prelim exam
Number of men * 6 days = 24 man-daysbr /br /Now, solve for the number of men:br /br /Number of men = 24 man-days / 6 days = 4 menbr /br /So, the answer is (b) 4 Men